Work · Board of 3The launch slipped three weeks. My design lead says engineering ignored the specs; my engineering lead says the designs changed mid-sprint. They’ve stopped talking. Both are strong and I can’t lose either.
Chief of staff
People, process and your part in it — a board. I’d seat The Empath, The Operator and The CEO.
The EmpathPeople Advocate
The OperatorCOO
The CEOChief Executive Officer
The board’s call
Meet each of them alone this week, then run one joint review of the slip — about the process, not the people.
Both stories are probably true: the specs changed and nobody owned the change. A rule for who freezes a design, and when, fixes the next launch.

The CEO disagreed
“You’re their manager. A review you only facilitate tells them you won’t make a call — that may be the problem.”
Example · Board of 3 · about 95 credits